Rock Demolition Inside Building

A dyno test instrument needed to be installed within an existing commercial building. After the structural floor was cut and removed, approximately one-half of the required volume of the pit was solid rock. The demolition and removal of the rock had to be precisely controlled in order to prevent any damage to the existing structure. The rock was removed, and the dyno installed.